Welcome to our websites!

V Series Dirty Water Submersible Pump

Short Description:

Product: Vortex sewage pump

Main Materials:

Top cover : cast iron

Motor case: stainless steel

Pump body: cast iron

Impeller: cast iron

Application:

For domestic or industrial waste water, dirty water with solids.
For river sewage, Municipal project, factory sewage, industrial sewage, basement sewage, farm irrigation and so on.


Product Detail

Product Tags

Product Description

V series submersible pump

V180F/V250F/V450F/V750F

Series-Submersible-Pump4

V1100F

Series-Submersible-Pump3

V1500F

Series-Submersible-Pump2

V2200F

Series-Submersible-Pump1

Working conditions

1. The maximum deep it is allowed in water is 5m from its center of impeller
2. The trans medium's temperature shouldn't be higher than 40℃
3. The trans medium's PHscope is from 4~10;
4. The kinematics viscosity of the trans medium is7×102-23×10 °m/s
5. The maximum density of the trans medium is 1.2×10'kg/m2.

Technical data

ta1
ta2

Function and feature

V series sewage pumps will be your ideal drainage helper.It can work safely and efficiently at high flux with the feature of complete heads. It is designed to a wide tunnel which helps to convey the long fiber liquid or the solid whose diameter.The selection of bottom suction structure,stainles steel and special cast iron made the pump has the capabilities of complete drain and high resistance of abrasion and corrosion.The float switch can automatically control on and off with the change of the liquor level. The protector in the motor can automatically cut off the power when it overheated or over current, thus guarantee the security and reliability of pimp's run even in the atrocious environment.

Production View

P-D1
P-D2

Brand

Could do OEM Brand,but if you use our brand, more support and competitive price you could get.

MOQ and sample

Sample or try order is ok.

Customized product

Accept your specific order with your special requirement ,or follow your sample details

Delivery time

Normally it will take about 30 days to finish the order after receiving the advance deposit.

Payment term

T/T term: 20% advance deposit,80%balance against copy of bill of lading
L/C term: normally L/C at sight, longer time for discuss.
D/P term, 20% advance deposit, 80% balance by D/P at sight
Credit insurance: 20% advance deposit,80% balance OA 60days after insurance company give us report, longer time for discuss

Warranty

One to two years from the shipment departure date on B/L


  • Previous:
  • Next:

  • Write your message here and send it to us